Voltrix today announced a 5 GW long-term agreement to power Helios DC’s new AI campus in Texas — one of the largest behind-the-meter power deals ever signed.
A campus that cannot wait
Helios DC needed gigawatt-scale power on a timeline the regional grid could not match. Voltrix will deliver the first 500 MW within 14 months.
Built to be cleaner over time
The system pairs hydrogen-ready turbines with 1.2 GWh of storage and 800 MW of solar, with a contractual path to 70% carbon-free supply by 2030.
“This is what firm, clean power at AI scale looks like.” — Marcus Hale, CEO, Voltrix
- 5 GW total contracted capacity
- First power: Q1 2028
- 1.2 GWh battery storage

Construction begins this quarter, with Voltrix operating the system for an initial 20-year term.