View

grid@voltrix.energy · +1 (512) 555-0190

Voltrix/Journal / Press

Voltrix signs 5 GW agreement with Helios DC

Nov 14, 2026 · 4 min read · By Marcus Hale

Voltrix today announced a 5 GW long-term agreement to power Helios DC’s new AI campus in Texas — one of the largest behind-the-meter power deals ever signed.

A campus that cannot wait

Helios DC needed gigawatt-scale power on a timeline the regional grid could not match. Voltrix will deliver the first 500 MW within 14 months.

Built to be cleaner over time

The system pairs hydrogen-ready turbines with 1.2 GWh of storage and 800 MW of solar, with a contractual path to 70% carbon-free supply by 2030.

“This is what firm, clean power at AI scale looks like.” — Marcus Hale, CEO, Voltrix
  • 5 GW total contracted capacity
  • First power: Q1 2028
  • 1.2 GWh battery storage

Construction begins this quarter, with Voltrix operating the system for an initial 20-year term.

Have a project in mind?

Tell us where you are and where you want to be. We will map the shortest route.

Related

You might also like